Fixed fee, before you commit
A fixed fee investigation of your cost, specification, programme and risk, ending with a written recommendation to proceed, adjust or stop. You keep the report whatever you decide.
Why it exists
Drawings are produced before anyone has properly priced them. The tender then arrives far above budget and months are lost redesigning.
A quick estimate is not a cost plan. Projects that begin with a guess often end with variations and a final bill nobody expected.
Design fees, planning and property decisions can all come before the central question has been answered: does the project actually work?
Sometimes the most valuable answer is the advice not to proceed.
Watch
Where it fits
Each stage answers a different question. You decide whether to continue at every point.
Free and instant
01An indicative budget range and headline timeline in minutes.
A range
Fixed fee
02Your site, planning position, cost, programme and risks investigated in detail.
A decision
If you choose to proceed
03Detailed design, final specification, firm pricing and the construction programme.
A contract
Delivery
04Your build is managed from the first day on site through to final checks, aftercare and the keys.
Your home
What you receive
The Feasibility Study is delivered as a single written report. Every section exists to answer one client question: can we do this, what will it cost, how long will it take, and what could go wrong?
It is produced by the people who would actually build your project, not a third party estimator. That is why the numbers hold up when construction starts.
If you go on to build with Mosaic, the study becomes the foundation of your contract documents: nothing is thrown away or repeated.
Feasibility Study
Mosaic · FS-001 · Rev A
Inside the document
These illustrative pages show the cost plan, time schedule and written recommendation. Your own study is produced for your project alone.
Elemental cost plan
§ 5.0 · p.14Sample
Time schedule
§ 7.0 · p.19Sample
Recommendation
§ 9.0 · p.24Viability verdict
Proceed, with two specification adjustments to hold the budget ceiling.
Sample
What it costs
The fixed fee is normally between 0.5% and 1.5% of the anticipated build contract value, depending on the project. The exact fee is always agreed before work begins.
Commissioning the survey, drawings, planning advice, cost plan and programme separately would typically cost £7,750 to £11,500 or more.

How the fee works
Is it right for you?
It is not designed for small repairs, free estimates or collecting quick quotes on price alone.
How it works
We confirm whether the study is the right next step.
We record the property, priorities and budget parameters.
We investigate the options and produce the report over four to six weeks.
We explain every finding and leave the decision with you.
Straight answers
No. A quote prices something that has already been fully defined. A Feasibility Study comes earlier. It tests whether the project is viable and defines the information needed to make a later price reliable.
Next step
Tell us about the project and we will help you decide whether the calculator, a Feasibility Study or another route is the right place to begin.