A glazed contemporary extension to a white rendered house

Fixed fee, before you commit

A Feasibility Study answers thequestion everything else assumes

A fixed fee investigation of your cost, specification, programme and risk, ending with a written recommendation to proceed, adjust or stop. You keep the report whatever you decide.

Why it exists

Most building projects do not fail on site. They fail on paper, months earlier.

Designed over budget

Drawings are produced before anyone has properly priced them. The tender then arrives far above budget and months are lost redesigning.

Priced on guesswork

A quick estimate is not a cost plan. Projects that begin with a guess often end with variations and a final bill nobody expected.

Committed too early

Design fees, planning and property decisions can all come before the central question has been answered: does the project actually work?

Sometimes the most valuable answer is the advice not to proceed.

Watch

What proper preparation looks like on site

The film shows the level of planning and detail that a Feasibility Study is designed to protect.

Where it fits

A range, a decision, then a contract.

Each stage answers a different question. You decide whether to continue at every point.

Free and instant

01

Project Calculator

An indicative budget range and headline timeline in minutes.

A range

Fixed fee

02

Feasibility Study

Your site, planning position, cost, programme and risks investigated in detail.

A decision

If you choose to proceed

03

Pre-Construction Service Agreement

Detailed design, final specification, firm pricing and the construction programme.

A contract

Delivery

04

Construction and Handover

Your build is managed from the first day on site through to final checks, aftercare and the keys.

Your home

What you receive

A document you can build on. Literally.

The Feasibility Study is delivered as a single written report. Every section exists to answer one client question: can we do this, what will it cost, how long will it take, and what could go wrong?

It is produced by the people who would actually build your project, not a third party estimator. That is why the numbers hold up when construction starts.

If you go on to build with Mosaic, the study becomes the foundation of your contract documents: nothing is thrown away or repeated.

Feasibility Study

Mosaic · FS-001 · Rev A

  • § 1.0Project brief and objectivesWhat you want to achieve, captured precisely.
  • § 2.0Measured surveyYour property, accurately recorded.
  • § 3.0Planning drawingsDrawn to a standard ready to apply, with minor adjustments.
  • § 4.0Planning appraisalBy our in-house planners: what consent will realistically allow.
  • § 5.0Elemental cost planCosts broken down by element, not one lump sum.
  • § 6.0Specification overviewThe standard of finish the numbers are based on.
  • § 7.0Time scheduleHow long it will take, stage by stage.
  • § 8.0Risk registerWhat could move the cost, and by how much.
  • § 9.0RecommendationOur honest professional verdict on viability.
Fixed fee typically 0.5% to 1.5% of contract value, always agreed before we start. Turnaround four to six weeks from site visit.

Inside the document

See the level of detail you receive

These illustrative pages show the cost plan, time schedule and written recommendation. Your own study is produced for your project alone.

Elemental cost plan

§ 5.0 · p.14
  • Substructure£ ●●,●●●
  • Superstructure£ ●●●,●●●
  • Roof£ ●●,●●●
  • Windows and doors£ ●●,●●●
  • Internal finishes£ ●●,●●●
  • M&E services£ ●●,●●●
  • External works£ ●●,●●●
  • Contingency£ ●●,●●●

Sample

Time schedule

§ 7.0 · p.19
  • Demolition
  • Groundworks
  • Superstructure
  • Roofing
  • First fix
  • Plastering
  • Second fix
  • Decorations
  • External works

Sample

Recommendation

§ 9.0 · p.24

Viability verdict

Proceed, with two specification adjustments to hold the budget ceiling.

  • Ground conditionsimpact band ● to ●●
  • Structural openingimpact band ● to ●●
  • Glazing lead timeprogramme +● wks
  • Party wall processprogramme +● wks

Sample

What it costs

A small investment before a much larger commitment.

The fixed fee is normally between 0.5% and 1.5% of the anticipated build contract value, depending on the project. The exact fee is always agreed before work begins.

Commissioning the survey, drawings, planning advice, cost plan and programme separately would typically cost £7,750 to £11,500 or more.

A completed bespoke home built by Mosaic Bespoke

How the fee works

The fee
0.5% to 1.5% of the anticipated build contract value
Agreed upfront
The exact fee is confirmed in writing before work begins
If we build it
The fee is credited in full against your build cost
Either way
The study is yours to keep and use as you wish

Is it right for you?

For people making a serious property decision.

  • A significant extension, renovation or new build
  • A property purchase you need to assess before exchange
  • Existing drawings that need an honest budget check
  • A need for evidence before committing further money

It is not designed for small repairs, free estimates or collecting quick quotes on price alone.

How it works

From conversation to a clear answer.

01

Enquiry and call

We confirm whether the study is the right next step.

02

Site visit and brief

We record the property, priorities and budget parameters.

03

The study

We investigate the options and produce the report over four to six weeks.

04

Review meeting

We explain every finding and leave the decision with you.

Straight answers

Questions we are often asked

No. A quote prices something that has already been fully defined. A Feasibility Study comes earlier. It tests whether the project is viable and defines the information needed to make a later price reliable.

Next step

Start with a conversation.

Tell us about the project and we will help you decide whether the calculator, a Feasibility Study or another route is the right place to begin.